Today was the day to pour the front walkway and stoop. I am standing on what will be the stoop looking down the walkway. It curves to connect with the driveway at the far end.
I included this picture with Seth in it so you can see the finished house slab which was poured on day 4, May 17th, just one day prior. On the far right of the picture is the patio slab, poured on day 3.
Tuesday, May 29, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment