Saturday, September 15, 2007

The house is now ready for drywall. September 12, 2007

These are some rough photos of the interior of the house after insulation, before drywall. As you may notice, the drywall has been stocked inside the house. As of today (Saturday), half the drywall is completed. I will try my best to describe to you which room(s) you are looking at. I think I am far more excited by these pictures than any of you will be.
This is the view from the front door looking kitty-corner. The bright window on your right is actually the kitchen window that is over the sink. The railing in the foreground is for the stairway. The framed in room with no insulation is the walk in pantry right off the kitchen.
This is a view of the master bedroom/bathroom. The arched doorway leads to the master bath.
This archway leads from the west bedrooms to the east bedrooms. The doorway directly ahead of you is the boys' room. To the right of that doorway, would be the girls' room and bathroom (both are out of view). The railing is open to the staircase below.
This is a view of the school room/guest room (left doorway) and one of our many bathrooms (right doorway).
This is a view down the stairs looking at the front door. The previous two pictures and this picture were taken from the same place. One was looking east, one was looking west and this one is looking down. Perhaps that helps you get an idea of the layout of the house.

No comments: